Jump to content

mb2 project


Hop78
 Share

Recommended Posts

alot of work in the last couple of weeks.

WORK DONE:-

New alloy oil sump installed

Full service (ngk iridium spark plugs, k&n flat panel filter,fuel filter, cabin filter, oil and filter change)

Rear brakes (drums and shoes)

Full coolant change

New vehicle speed sensor

New ECU, immobiliser, ignition, boot lock and door lock fitted

Full set of coilovers fitted and dropped about 100mm from the standard height the car was.

New drop links and bushes fitted

Cat back powerflow fitted

Bonnet sanded and wrapped in carbon (peeling lacquer)

Heater control panel, ash tray, and gear surround wrapped in carbon

Alloys changed from scabby standard 14" to 15" black gloss (think they are described as fan blades, standard wheels of a vti-s i think)

Sanded and painted badges and chrome trim in satin black

WORK STILL TO DO:-

Carbon wrap the roof (once i get a decent days weather)

Front pads and disc

Uprated rear control arms

Pictures to follow

Link to comment
Share on other sites

  • Replies 29
  • Created
  • Last Reply

Top Posters In This Topic

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...