Quick update, been away in New Zealand with work for a few weeks so no solid progress on the car but parts arrived while i was away so I got a few small jobs done on Sunday.
Fuel System - finally bought all the fittings and hose to do the fuel system. Spent about 2 hours routing and plumbing it in but will need a bit more work. At least all the hoses are now cut to length.
Fuel pickup, to filter (which will have a top cover), to the bulkhead. Return is attached and back to tank. Finally the vent is sent straight up to the cage, looped back and needs a bulkhead fitting putting in to vent to the outside of the car in a "dead air zone"
Fuel lines from the rail to the fuel pressure regulator and then back along the bulkhead. Excuse the wiring, need to tidy up the routing